New Bicycle Bridge Over the IJ: A Step Towards Better Connectivity in Amsterdam

By Ivan PetrenkoJul 16, 2024 05:30 AMNews
Share:
Idyllic scene with bicycle and canal. Source: unsplash

The funds for the Oostbrug are secured. Both the Vervoerregio and the municipality will jointly finance and construct this bridge. The bicycle and pedestrian bridge will span from Azartplein to Johan Van Hasseltweg, with a projected completion date no earlier than 2034.

The bridge over the IJ is a significant development for improving connectivity between Noord and the rest of Amsterdam. The Vervoerregio, alongside the municipality, is allocating extra funds for this project. This bridge aims to enhance accessibility to various parts of the city and region by bicycle.

The Oostbrug will enable cyclists from Noord to reach the eastern side of Amsterdam 10 to 12 minutes faster. They will no longer need to dismount for the ferry. The bridge will connect to the inner ring, a fast bicycle route around central Amsterdam, providing quick access to the city center.

The construction costs are estimated at approximately 300 million euros. Both the municipality and the Vervoerregio will each cover half of these costs. Additionally, the municipality is setting aside funds for safe routes to and from the bridge. This decision still requires approval from the Regioraad. Also, following the Oostbrug, there are also plans for the Westbrug, which will connect the NDSM wharf in Amsterdam-Noord with the Danzigerkade in Amsterdam-West.

Alderman Melanie van der Horst expressed her satisfaction with the joint effort between Amsterdam and the Vervoerregio: "A fixed link between Noord and the rest of the city is crucial for Amsterdam's residents and neighboring municipalities. With numerous new homes and workplaces being developed across the region, the number of people needing to cross the IJ is increasing. The ferries cannot handle this capacity. We anticipate that 20,000 to 25,000 people will use the bridge daily."

The municipality and Vervoerregio are collaborating with the Ministry of Infrastructure and Water Management, Rijkswaterstaat, the Province of Noord-Holland, Port of Amsterdam, and the Central Nautical Management. Detailed planning will continue in the coming years, followed by the decision to proceed with construction and the announcement of tenders to market parties. Construction is expected to begin in 2031, with the earliest completion in 2034.

Top Articles

Top 10 reasons for flight cancelation by airlines: a clear algorithm of actions to get compensation

Oct 16, 2025 16:22 PM

Where to Buy eSIM at the Best Price: A Full Review of Tariffs and Options

Aug 8, 2025 10:54 AM

Internet on a Cruise: How to Avoid Huge Bills for Connectivity

Aug 6, 2025 09:14 AM

No More SIM Swaps: The eSIM Travel Solution You’ll Actually Use

Aug 4, 2025 16:51 PM
More News

LOT Adds Three New Routes from Gdańsk, Opening Direct Links to Key European Cities

Dec 11, 2025 09:26 AM

Finnair Brings Christmas Traditions into the Air This December

Dec 11, 2025 08:43 AM

New Athens–Hamburg Route Expands Greece–Germany Travel Links

Dec 11, 2025 07:39 AM

Glasgow Transport to Shift on 14 December as Crowds Head for Cup Final

Dec 10, 2025 17:25 PM

New Sunday Timetable Opens Up Smoother Coastal Travel in Norfolk

Dec 10, 2025 16:42 PM

Strong Winds from Storm Bram May Affect Routes in Northern Scotland

Dec 10, 2025 15:38 PM

New Luxury Resort Opens on Saudi Arabia’s Shura Island

Dec 10, 2025 02:26 AM

Ryanair to Pull Back in Belgium After Higher Passenger Taxes Announced

Dec 10, 2025 01:33 AM

Holiday Flights at Risk as Air Transat Pilots Signal December Strike

Dec 10, 2025 00:47 AM

Nighttime Train Shutdown in Veneto May Change Traveller Routes

Dec 9, 2025 19:24 PM

Travellers Face Delays as Key Liverpool Routes Slow Down

Dec 9, 2025 18:31 PM

Travellers Gain New Ways to Explore Milano Cortina 2026 Before the Games

Dec 8, 2025 23:41 PM

Peak December Crowds Expected at Helsinki Airport as Holiday Travel Builds

Dec 8, 2025 22:27 PM

New Route Links Bristol with Verona for Winter Travel

Dec 8, 2025 21:32 PM

Heraklion Airport Shuts Down as Farmers’ Protests Escalate Across Crete

Dec 8, 2025 20:43 PM

Growing Year-End Fatigue Pushes Travelers Toward Easy, Stress-Free Breaks

Dec 8, 2025 19:59 PM

Paddington Hosts Touring Rail Display Offering New Insights for Passengers

Dec 8, 2025 18:36 PM

Holiday Strikes at Luton Signal Travel Disruption Ahead

Dec 7, 2025 23:37 PM

Travellers Face New Routes and Schedules as ScotRail Updates December Timetable

Dec 6, 2025 23:46 PM

Music Break at Roma Termini Gives Travellers a Chance to Slow Down

Dec 6, 2025 22:53 PM

A New Place to Stay Brings Travelers Into the Heart of Houston Heights

Dec 6, 2025 20:39 PM

India’s Flight Disruptions Deepen as IndiGo Cancels Over 1,000 Services

Dec 6, 2025 18:45 PM

Ryanair Adds New Newcastle–Wrocław Link for Winter 2025

Dec 6, 2025 01:22 AM

Air India–Maldivian Deal Opens New Pathways Across the Maldives

Dec 6, 2025 00:38 AM

Air France Expands La Première Offering Across New Long-Haul Routes

Dec 5, 2025 23:46 PM

Helsinki Stopover: How to Turn a Layover into a Mini City Break

Dec 5, 2025 23:39 PM